Site Log

2018-08-07 :: Added final wiring and assembly steps. The first draft of assembly content is done and ready for proof reading, revising and embellishing.

2018-08-02 :: Added Bits and Bobs and started documenting the wiring.

2018-08-01 :: Drafting out more steps.

2018-07-31 :: Added base Panel assembly section and other minor content revision.

2018-07-28 :: Back to working on the instructions. Added Z-axis belt.

2018-07-16 :: Updated structure of Site Log and added Credits

2018-07-15 :: Slowly working through content and my machine assembly. A couple more sections posted.

2018-07-10 :: added more content, working on Lifting Platform Pt. II

2018-07-06 :: Site creation in progress